{"id":2313,"date":"2025-02-12T16:42:07","date_gmt":"2025-02-12T16:42:07","guid":{"rendered":"https:\/\/grandrapidspost.com\/?p=2313"},"modified":"2025-02-12T06:11:15","modified_gmt":"2025-02-12T06:11:15","slug":"grand-havens-multi-million-dollar-infrastructure-upgrade-set-to-begin","status":"publish","type":"post","link":"https:\/\/grandrapidspost.com\/index.php\/2025\/02\/12\/grand-havens-multi-million-dollar-infrastructure-upgrade-set-to-begin\/","title":{"rendered":"Grand Haven&#8217;s Multi-Million Dollar Infrastructure Upgrade Set to Begin"},"content":{"rendered":"<div class=\"flex-1 overflow-hidden @container\/thread translate-y-[2rem] -mt-[2rem] pb-[1.5rem]\">\n<div class=\"flex h-full flex-col overflow-y-auto\">\n<div class=\"flex flex-col text-sm md:pb-9\">\n<article class=\"w-full text-token-text-primary focus-visible:outline-2 focus-visible:outline-offset-[-4px]\" dir=\"auto\" data-testid=\"conversation-turn-5\" data-scroll-anchor=\"true\">\n<div class=\"m-auto text-base py-[18px] px-6\">\n<div class=\"mx-auto flex flex-1 gap-4 text-base md:gap-5 lg:gap-6 md:max-w-3xl\">\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn @xs\/thread:px-0 @sm\/thread:px-1.5 @md\/thread:px-4\">\n<div class=\"flex-col gap-1 md:gap-3\">\n<div class=\"flex max-w-full flex-col flex-grow\">\n<div class=\"min-h-8 text-message flex w-full flex-col items-end gap-2 whitespace-normal break-words text-start [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"b1039620-ca5f-4898-af19-0422a6424720\" data-message-model-slug=\"gpt-4o-mini\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose w-full break-words dark:prose-invert light\">\n<p data-start=\"76\" data-end=\"400\">Grand Haven, Mich. \u2014 A multi-million-dollar reconstruction project is set to transform a key section of Grand Haven. The city is preparing for a comprehensive overhaul of Fulton Street, spanning from 1st to 5th Street, with work expected to begin in late spring or early summer and be completed before the end of the year.<\/p>\n<p data-start=\"402\" data-end=\"807\">Assistant City Manager Dana Kollewehr confirmed that the nearly $3 million project is long overdue, with discussions about the improvements starting back in 2018. After years of planning and securing funding, the upgrades are now becoming a reality. The project will address several critical infrastructure issues, including the replacement of outdated water mains, fire hydrants, sidewalks, and parkways.<\/p>\n<p data-start=\"809\" data-end=\"1038\">&#8220;This full-scale reconstruction project is something we have needed for many years. It&#8217;s been in the works for a while,&#8221; Kollewehr said. &#8220;We are upgrading our infrastructure to meet the current and future needs of the community.&#8221;<\/p>\n<p data-start=\"1040\" data-end=\"1468\">One of the key drivers behind the project is the outdated water system that was highlighted during a January fire in the area. At the time, firefighters struggled with water pressure and had to rely on water trucks to sustain the fire response. While the fire itself did not directly trigger the reconstruction plans, Kollewehr noted that the timing of the upgrades aligns perfectly with the need to improve fire safety systems.<\/p>\n<p data-start=\"1470\" data-end=\"1675\">&#8220;The water service that we had available at the time was not ideal,&#8221; Kollewehr explained. &#8220;Fortunately, this project will update the very infrastructure necessary to fight fires and protect our community.&#8221;<\/p>\n<p data-start=\"1677\" data-end=\"1961\">The water pipes currently in place date back to the 1960s. Although they have passed inspection and functioned properly, they do not meet the standards needed for modern-day demands. For residents like Dareen Breen, who witnessed the fire firsthand, the upgrades are a welcome change.<\/p>\n<p data-start=\"1963\" data-end=\"2131\">&#8220;Water trucks had to go back and forth to maintain the water levels needed to fight the fire,&#8221; Breen said. &#8220;It definitely shows that a new water system is a good idea.&#8221;<\/p>\n<p data-start=\"2133\" data-end=\"2422\">Local residents have expressed excitement over the planned improvements. Breen, in particular, is looking forward to the new waterlines, fire hydrants, and roads. &#8220;It\u2019s great. New waterlines, new fire hydrants, new roads\u2014this is a pretty crummy road. There really is no downside,&#8221; he said.<\/p>\n<p data-start=\"2424\" data-end=\"2733\">However, some neighbors, like Susan Silvis, have voiced concerns about potential disruptions during construction. &#8220;We already have parking issues, especially in the summer with the increased activity in the area,&#8221; Silvis said. &#8220;But it\u2019s a small inconvenience to have what we need. We will all get through it.&#8221;<\/p>\n<p data-start=\"2735\" data-end=\"3031\">Kollewehr acknowledged these concerns, emphasizing that the city is committed to minimizing disruptions during the reconstruction. She reassured residents that the project would be completed as efficiently as possible, ensuring the long-term safety and functionality of the city&#8217;s infrastructure.<\/p>\n<p data-start=\"3033\" data-end=\"3211\" data-is-last-node=\"\">With work slated to begin in the coming months, Grand Haven residents can look forward to a significantly upgraded infrastructure that will serve the community for years to come.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mb-2 flex gap-3 empty:hidden -ml-2\">\n<div class=\"items-center justify-start rounded-xl p-1 flex\">\n<div class=\"flex items-center\"><\/div>\n<\/div>\n<\/div>\n<div class=\"pr-2 lg:pr-0\"><\/div>\n<div class=\"mt-3 w-full empty:hidden\">\n<div class=\"text-center\"><\/div>\n<\/div>\n<\/div>\n<div class=\"absolute\">\n<div class=\"flex items-center justify-center\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"md:pt-0 dark:border-white\/20 md:border-transparent md:dark:border-transparent w-full isolate has-[[data-has-thread-error]]:[box-shadow:var(--sharp-edge-bottom-shadow)] has-[[data-has-thread-error]]:pt-2\">\n<div class=\"m-auto text-base px-3 md:px-4 w-full md:px-5 lg:px-4 xl:px-5\">\n<div class=\"mx-auto flex flex-1 gap-4 text-base md:gap-5 lg:gap-6 md:max-w-3xl\">\n<div class=\"flex justify-center empty:hidden\"><\/div>\n<div class=\"relative z-[1] flex h-full max-w-full flex-1 flex-col\">\n<div class=\"absolute bottom-full left-0 right-0 z-20\"><\/div>\n<div class=\"group relative z-[1] flex w-full items-center\">\n<div class=\"w-full\">\n<div id=\"composer-background\" class=\"flex w-full cursor-text flex-col rounded-3xl border border-token-border-light px-3 py-1 duration-150 ease-in-out contain-inline-size motion-safe:transition-[color,background-color,border-color,text-decoration-color,fill,stroke,box-shadow] dark:border-none dark:shadow-none shadow-[0_9px_9px_0px_rgba(0,0,0,0.01),_0_2px_5px_0px_rgba(0,0,0,0.06)] has-[:focus]:shadow-[0_2px_12px_0px_rgba(0,0,0,0.04),_0_9px_9px_0px_rgba(0,0,0,0.01),_0_2px_5px_0px_rgba(0,0,0,0.06)] bg-token-main-surface-primary dark:bg-[#303030]\">\n<div class=\"flex min-h-[44px] items-start pl-1\">\n<div class=\"min-w-0 max-w-full flex-1\">\n<div class=\"_prosemirror-parent_1r7mb_1 text-token-text-primary max-h-[25dvh] max-h-52 overflow-auto default-browser\">\n<div id=\"prompt-textarea\" class=\"ProseMirror\" data-virtualkeyboard=\"true\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Grand Haven, Mich. \u2014 A multi-million-dollar reconstruction project is set to transform a key section of Grand Haven. The city is preparing for a comprehensive overhaul of Fulton Street, spanning from 1st to 5th Street, with work expected to begin in late spring or early summer and be completed before the end of the year. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2314,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[3],"tags":[],"class_list":{"0":"post-2313","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-local-news"},"_links":{"self":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/comments?post=2313"}],"version-history":[{"count":1,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2313\/revisions"}],"predecessor-version":[{"id":2318,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2313\/revisions\/2318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/media\/2314"}],"wp:attachment":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/media?parent=2313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/categories?post=2313"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/tags?post=2313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}