{"id":2470,"date":"2025-02-28T20:44:24","date_gmt":"2025-02-28T20:44:24","guid":{"rendered":"https:\/\/grandrapidspost.com\/?p=2470"},"modified":"2025-02-28T05:29:40","modified_gmt":"2025-02-28T05:29:40","slug":"walker-to-begin-major-fruit-ridge-avenue-bridge-expansion-this-spring","status":"publish","type":"post","link":"https:\/\/grandrapidspost.com\/index.php\/2025\/02\/28\/walker-to-begin-major-fruit-ridge-avenue-bridge-expansion-this-spring\/","title":{"rendered":"Walker to Begin Major Fruit Ridge Avenue Bridge Expansion This Spring"},"content":{"rendered":"<article class=\"w-full text-token-text-primary focus-visible:outline-2 focus-visible:outline-offset-[-4px]\" dir=\"auto\" data-testid=\"conversation-turn-5\" data-scroll-anchor=\"true\">\n<div class=\"m-auto text-base py-[18px] px-6\">\n<div class=\"mx-auto flex flex-1 text-base gap-4 md:gap-5 lg:gap-6 md:max-w-3xl\">\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn @xs\/thread:px-0 @sm\/thread:px-1.5 @md\/thread:px-4\">\n<div class=\"flex-col gap-1 md:gap-3\">\n<div class=\"flex max-w-full flex-col flex-grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 whitespace-normal break-words text-start [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"a973f7a3-7856-44fb-9e18-ff864360daed\" data-message-model-slug=\"gpt-4o-mini\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose w-full break-words dark:prose-invert light\">\n<p data-start=\"75\" data-end=\"466\">WALKER, Mich. \u2014 The long-awaited expansion of the Fruit Ridge Avenue Bridge is set to begin this spring, marking the final phase of a yearslong effort to improve the corridor in northwest Walker. The project, a joint venture between the city of Walker and the Michigan Department of Transportation (MDOT), will replace the existing bridge over I-96 and the connected highway interchange.<\/p>\n<p data-start=\"468\" data-end=\"942\">The Fruit Ridge Avenue Bridge, built in 1961, currently consists of just two lanes\u2014an outdated configuration for a rapidly growing area. With increasing traffic and new developments, including a nearby Amazon facility, the bridge has become a bottleneck during peak travel hours. MDOT spokesman John Richard noted that while the bridge is technically a city road, any local road crossing I-96, US-31, or M-6 falls under the state&#8217;s jurisdiction for maintenance and upgrades.<\/p>\n<p data-start=\"944\" data-end=\"1354\">The road on either side of the bridge has already been expanded to five lanes to accommodate the area&#8217;s significant growth in recent years. However, the bridge itself has remained narrow. \u201cIf you look at the satellite photo, you can see just how skinny the bridge is compared to the wider roads to the north and south,\u201d Richard said. \u201cThe growth in the area has been so substantial in the last 10 to 20 years.\u201d<\/p>\n<p data-start=\"1356\" data-end=\"1625\">Scott Conners, the city engineer for Walker, echoed Richard\u2019s comments, explaining that the city has been upgrading its road system to keep up with the area&#8217;s booming industrial sector. \u201cThis is the most expensive part of the upgrades that are necessary,\u201d Conners said.<\/p>\n<p data-start=\"1627\" data-end=\"2198\">In January 2023, the Michigan Legislature approved $25 million to fund the replacement of the bridge. The new structure will widen the bridge to five lanes, aligning it with the road on either side. Additionally, pedestrian and cycling lanes will be added to enhance safety for people walking or biking across the bridge. Conners explained that there have been increasing concerns for those attempting to cross the bridge on foot or by bike, particularly during rush hour. \u201cThere are even stories of somebody in a wheelchair trying to cross it during rush hour,\u201d he said.<\/p>\n<p data-start=\"2200\" data-end=\"2622\">The new lanes will also connect to several regional trail networks, including the Musketawa Trail and Fred Meijer White Pine Trail, offering easier access to the lakeshore and downtown Grand Rapids. Richard emphasized that the expansion will benefit not just motorists but also non-motorized users. \u201cWe are all about transportation. Not just for vehicles,\u201d Richard said. \u201cThis will be a huge addition to the whole system.\u201d<\/p>\n<p data-start=\"2624\" data-end=\"2848\">A public informational meeting about the project is scheduled for Monday, March 3, from 4:30 p.m. to 6 p.m. at Walker City Hall. Residents are encouraged to attend to learn more about the plans and the construction timeline.<\/p>\n<p data-start=\"2850\" data-end=\"3052\" data-is-last-node=\"\" data-is-only-node=\"\">As part of the preparations for the bridge replacement, MDOT closed the Walker rest area on I-96 in October. Due to ongoing funding and maintenance issues, the rest area will remain closed indefinitely.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mb-2 flex gap-3 empty:hidden -ml-2\">\n<div class=\"items-center justify-start rounded-xl p-1 flex\">\n<div class=\"flex items-center\"><\/div>\n<\/div>\n<\/div>\n<div class=\"mt-3 w-full empty:hidden\">\n<div class=\"text-center\"><\/div>\n<\/div>\n<\/div>\n<div class=\"absolute\">\n<div class=\"flex items-center justify-center\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"pointer-events-none h-px w-px\" aria-hidden=\"true\" data-edge=\"true\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>WALKER, Mich. \u2014 The long-awaited expansion of the Fruit Ridge Avenue Bridge is set to begin this spring, marking the final phase of a yearslong effort to improve the corridor in northwest Walker. The project, a joint venture between the city of Walker and the Michigan Department of Transportation (MDOT), will replace the existing bridge [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2474,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-2470","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-uncategorized"},"_links":{"self":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/comments?post=2470"}],"version-history":[{"count":1,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2470\/revisions"}],"predecessor-version":[{"id":2478,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/posts\/2470\/revisions\/2478"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/media\/2474"}],"wp:attachment":[{"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/media?parent=2470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/categories?post=2470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grandrapidspost.com\/index.php\/wp-json\/wp\/v2\/tags?post=2470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}